Over the last few months i have been contacted by numerous people to create project drawings for jobs that have been refused when designed by other firms, McGarrys Design have considered all the previous planning objections and neighbouring comments to create acceptable designs for all.
Thses projects are is 35 Brindley Close , 15 Limefield, 177 Warmsley old rd and 219 Church street, 15 Limefield Ave Has been refused planning previously due to boundary problems and distances to a side wall from on looking principle window. McGarrys Design have now created designs within permitted development which was not considered before to achieve the required space at the side and sought a lawful certificate as planning would again be refused if sought so this is the best procedure to achieve anything,. So a side extension was designed with first floor bathroom extension, this was designed in accordance to Town and Country Planning Act 1985 guideline’s (has now passed Febuary 2012)
35 Brindley Close Received positive pre-application advise before submission and has now been passed  April 2012. The original issues where the on looking distances from neighbouring windows to the gable walls which was not considered by other professional bodies but McGarrys Design have encompassed acceptable distances to the new design and obtained structural calcs for supports to first floor walls, drawings will be shown on portfolio soon. The existing garage is to be converted into a new children’s play area with rear kitchen extension and the bathroom is to be relocated above, the staircase will be moved adjacent the play area thus making the landing larger and gaining more room for the new bedroom
177 Warmsley Old Rd My client is a car enthusiast and has 7 cars which due to cost need to be housed over night for insurance purpose. They have had other companies design and submit planning applications but have resulted in failure so McGarrys Design have been contacted and briefed and have suggested one large side garage with full roof over the existing garage and new in the hipped formation as the house. New designs and drawings take into consideration all previous objections and show distances to neighbouring houses taken by laser justifying all new distances to walls and indicating all actual boundary positions. The new roof is massive and blends in nicely with the existing house and surrounding area although very large is not disproportionate and has now been passed March 2012

219 Church Street This property was previously a frame shop and due to expense and objections in the area/neighbours it has not yet had the front changed to a residential house as required. McGarrys Design have been contacted and encompassed all the guidelines and concerns into a new design of the front which has now had positive pre-application advise and was submitted March 2012. This property as well as having the front changed they have now decided to amend the interior to achieve a new dining room with front lobby, the new dining area is to have the fire place removed creating more space and my structural engineer will design beams adequate and all the walls surrounding the newly created room will be dry lined as client has concerns of insulated walls due them being Victorian solid 150mm thick adjoining walls. Also for the next job of moving the position of the stairs, the central solid dividing wall is to have door located ready and will have the shop hatch sealed. A positive application outcome is expected due to planning feedback

 

 

Sept-Nov 2011

September 16, 2011

Since June we have been extremely busy with residential extensions, including bungalow extensions/dormers, many garage conversions and new garages, a few single storey and some double storey up and over garage extensions 

The bungalow extension in Westoughton have been designed which creates a ‘U’ shaped house and a court yard; this has needed a considerable amount of planning liaison’s due to the unnecessary objections. We have recently heard this will still go ahead despite five ob...


Continue reading...
 

June 2011

June 25, 2011
Since April i have been very busy with an multiple development  in Lostock including developments around TPO's trying to please the planning officers and my clients. The drawings for this project have now been finished and submitted. Over the past few weeks there seems to have been a trend with dormers and loft conversions which i am convinced is more of a seasonal thing. This is said due to people contacting me at different times over the year with regards extensions and they are always, or ...
Continue reading...
 

April 2011

April 22, 2011
This month we have started a 19 house small estate in Telford Street, Horwich, Bolton, as yet we have only completed the first block consisting of four, three bedroom houses. The drawings style for these projects has been a new style adopted for new houses which is different from extensions which has been Mcgarrys Design main objective since conception. We have done new properties before but as there is to be a conveyor soon for new houses in Horwich this drawing style is a great advantage. M...
Continue reading...
 

March 2011

March 26, 2011
Since December leading to mid March i have been extremly busy with five single storey extensions and a particular double storey extension on a bungalow. Within this bugalow we converted the existing and new loft space created from the rear and side large extension produced. Within I creating 3 decent size bedrooms, one with ensuite and walkin wardrobe due to the high headroom and space allowance within the roof. Am,ongst the ground floor a new kitchen was built, including a lounge dinner exte...
Continue reading...
 

DEC 2010

December 6, 2010

So far 2010 <?has been a very successful year designing  two farm houses as mentioned earlier which have all gained approval in greenbelt areas and doing some extension design that have needed allot of imagination and architectural  knowledge as well as doing some traditional single and double storey extensions.<?

Most recent projects have been redesign of a terrace house into a shop including extension to the rear and flat above with loft conversion, a similar project was designed prev...


Continue reading...
 

OCT 2010

October 2, 2010

Since April 2010 i have been very busy with four Single storey extensions 5 double storey extensions also the odd loft conversion. I have now been informed the housing estate in Horwich on Portman mill site, drawings for these start Nov 2010. I have been involved with a few office conversions changing listed building into large office developments also changing a joinery work shop back into a residential flat (planning has been main aspect of job-change of use) I have done plently of planning...


Continue reading...
 

APRIL 2010

April 25, 2010
In april 2010 i have finally finished the farm house in Simonswood due to the greenbelt restrictions, the design has been very satisfying and the client is very happy. The farm house in lostock Bolton also due to greenbelt has been given the go ahead just a few final details before drawings and designs can commence. New extensions started, second storey over garages, single storey and double storey extensions. Extensions completed november 2009 are actually starting to be build and other proj...
Continue reading...
 

SINCE THE COMPANY BEGAN

March 23, 2010

Since the company began in August 2008 emphasis has been around double/single storey extensions and loft conversions, some people have even requested their bungalows to be transformed by internal alterations and with the addition of full size front and back dormer extensions.

I have designed many different types and sizes of dormers for bungalows and all creations have greatly enhanced the lives of families with the additional space. I perform all the construction stages of a project; exi...


Continue reading...
 

Green-Belt sites

March 21, 2010

Over the early months of 2010 as well as achieving planning permission for sites with greenbelt areas, I have carried on with the usual double and single storey extensions some of which need planning some are permitted development.

Since March 2010 I have started a new housing estate in Horwich Bolton where the is an existing mill previously burnt down, planning permission for the 20 proposed houses is being sought by the developers planning consultants and we have been asked to do the bu...